The Group approached us with a vision for Jeru that included some incredible specialist features, encompassing a carved stone staircase and bespoke metalwork, in particular a copper wash hand basin in the toilets.
The project spanned two floors - the ground floor featuring a fully open kitchen with seating along the length of the pass - the lower ground floor with more restaurant seating and toilets, and ecsec completed the entire fit out exclusively in just 20 weeks.